Categories
Nfl Betting

Buy a two -room apartment of Khimki, Leninsky Prospekt, 20 -announcement No. 1370

Announcement for the sale of a two -room apartment with an area of ​​Khimki, Leninsky Prospekt, 20 cost of sale 6 950 000 ₽ – push-ka.ru

2-room. flat

© 2018 Professional Real Estate Marketplace Push-Ka (P.R.E.M. Push-Ka). Using materials reference to the site is obligatory.

Materials and information, including prices published on this site, are exclusively informational in nature and under any conditions are not a public offer determined by the provisions of Article 437 of the Civil Code of the Russian Federation. To obtain detailed information, you need to contact managers. Continuing to use the website mls.push-ka.ru, you consent to process processing cookies, user data (location information; type and version of the OS; type and version of the browser; type of device and resolution of its screen; source from where came from the site User; from which site or by what advertising; the language of the OS and the browser; what pages does it open and what buttons the user presses; IP addresses) for the functioning of the site, retargeting and conducting statistical research and reviews. If you do not want these data to be processed, leave the site.

Categories
Nfl Betting

Buy a house in Kirillov in the Kirillovsky district — 34 houses for sale on MirKvartir with prices and photos

Buy a house 🏡 in Kirillov in the Kirillovsky district. ➜ 34 listings of houses for sale in the MirKvartir real estate database – a quick search ⚡ and current real estate prices. The average cost of objects in Kirillov in the Kirillovsky district is 3 324 637.07 rubles, the area is from 25 m².

Houses for sale in Kirillov in the Kirillovsky district

House, 78.1 m²

For sale a variant of a residential building in the city of Kirillov, on the street. Kirillovskaya. Area – 78.1 sq. m. On The Plot Of Garden. The house has sewerage, storage room, heating. Within walking distance of the bank, the road.

House, 300 m²

House, 300 m²

83 334 rub. /m²

I sell a large private house for finishing at the address Kirillov, st. Gagarin,. Total area – 300 sq. m. The House Has Gas Supply, A Storage Room Is Provided. Near the pond, the road. Garden in the yard.

House, 120 m²

House, 120 m²

31 667 rub. /m²

At the address: Kirillov, I propose to buy a private house of 120 sq. m. with a plot of land. The house has electricity and a storage room. 10 minutes road, lake.

House, 129.7 m²

more than 3 months ago

House, 129.7 m²

37 009 rub. /m²

We offer for sale a two-storey house with an area of ​​129.7 sq. m. The House Has Gas Supply, Heating, Sewerage, A Storage Room Is Provided. Near the road.

House, 50 m²

House, 50 m²

17 000 rub. /m²

A residential building is put up for sale, the area is 50 sq. m. The House Has Gas, Sewage, A Storage Room, Water Is Supplied. 5 minutes hardware store, bank office, road. Garden area. Address: Kirillov, st. Bazarnaya.

House, 55 m²

more than 3 months ago

House, 55 m²

18 164 rub. /m²

I propose to buy a 1-storey house on the land. Area – 55 sq. m. The house has a pantry, heating, gas. 5 minutes road, lake. Address: Kirillov, st. Dzerzhinsky.

House, 80 m²

House, 80 m²

37 500 rub. /m²

Large residential building at Kirillov. The total area is 80 sq. m. The House Has Heating, A Pantry Is Provided, There Is A Sewage System, There Is Light. Near the road.

House, 110 m²

House, 110 m²

38 182 rub. /m²

For sale residential building with a plot of land. Area – 110 sq. m. The House Has Sewerage, Electricity, Storage Room, Heating. In 10 minutes the lake, the road. Address: Kirillov, st. Vorovsky.

House, 50 m²

more than 3 months ago

House, 50 m²

17 000 rub. /m²

A large one-story house without finishing is put up for sale at the address Kirillov. The total area is 50 sq. m. The house has a storage room. 5 minutes road. Landscaped area in the yard.

House, 300 m²

House, 300 m²

83 334 rub. /m²

A large two-story house for finishing is put up for sale at Kirillov, st. Obukhova,. Total area – 300 sq. m. The House Has A Storage Room, There Is Gas. Near the pond for fishing, the road. Landscaped area in the yard.

House, 28 m²

House, 28 m²

17 858 rub. /m²

I sell a house on the land. Area – 28 sq. m. The House Has Electricity, Gas, A Storage Room Is Provided. 10 minutes hardware store, road, lake. Address: Kirillov, st. Dolgozersky.

House, 87 m²

House, 87 m²

30 460 rub. /m²

Selling a private house with a plot of land. The total area is 87 sq. m. The House Has Heating, A Storage Room, Gas.In 10 minutes a pond for fishing, road. Address: Kirillov, st. Labor.

House, 83 m²

House, 83 m²

50 603 rub. /m²

A private house has been put up on sale, total area- 83 square meters. m. In the house heating, there is light, sewage, there is gas, a pantry is provided. In walking distance, Lake, Road. The site is beautiful and well -groomed. Address: G. Kirillov.

House, 87 m²

House, 87 m²

30 460 rub. /m²

I offer a house on a land plot for sale. Square- 87 square meters. m. In the house heating, gas is summed up, a pantry is provided. 5 minutes road, pond. Address: Kirillov, st. Labor.

House, 57 m²

House, 57 m²

21 053 rub. /m²

On sale is the option of a new private house in the city of Kirillov, on the street. October. Square- 57 square meters. m. The site is beautiful and well -groomed. In the house of gas, a pantry is provided, heating. In a 5 -minute road, shop, educational institution.

House, 100 m²

House, 100 m²

30 000 rub. /m²

Sale of a private house in the city of Kirillov, on the street. Matrosov. Square- 100 square meters. m. In the house of electricity, there is water, a pantry is provided. The road is nearby.

House, 85 m²

more than 3 months ago

House, 85 m²

35 295 rub. /m²

On sale is a variant of a great 1-story building in the city of Kirillov, on the street. Labor. Square- 85 square meters. m. on the site of beds and shrubs. The house has electricity, gas, a pantry is provided. Near the road, shop, lake.

House, 85.4 m²

House, 85.4 m²

49 181 rub. /m²

On sale a two-level house with a total area is 85.4 square meters. m. at the address of Kirillov, st. Paryshkinskaya. The house has a pantry. The road is nearby. On the land plot is a garden.

House, 70 m²

House, 70 m²

42 858 rub. /m²

I offer for sale a private house with a total area of ​​70 square meters. m. at the address of Kirillov, st. Matrosov. The house has a pantry, gas, electricity has. Not far educational institution, road, household store. On the site of beds and shrubs.

House, 85.4 m²

more than 3 months ago

House, 85.4 m²

49 181 rub. /m²

I offer for sale a new two -level house with an area of ​​85.4 square meters. m. for finishing. The house has a pantry. The road is 10 minutes. Address: Kirillov, st. Paryshkinskaya.

House, 100 m²

House, 100 m²

18 900 rub. /m²

It is offered for sale an excellent house with a total area of ​​100 square meters. m. Repair. The house has a pantry, heating, there is gas. In a 10 -minute school, road, household store. Address: Kirillov, st. Soviet.

House, 100 m²

House, 100 m²

21 000 rub. /m²

I offer a large private house without finishing at sale at the address of Kirillov, st. Sovetskaya,. The total area is 100 square meters. m. The house has a pantry, heating, gas. Near the road, grocery store, educational institution. In the yard is a garden.

Cottage, 229 m²

Cottage, 229 m²

27 760 rub. /m²

It is proposed to buy a cottage in Kirillov, on the street. Soviet. Square- 229 square meters. m. The house has a pantry, heating, there is a sewage system. On the site of beds and shrubs. Near the track. Developed area.

House, 35 m²

more than 3 months ago

House, 35 m²

22 858 rub. /m²

I offer a 1-story house with a total area of ​​35 square meters. m. at the address of Kirillov, st. October. The house has a pantry, gas. In a 5 -minute, kindergarten, school, household store, road. There is a crop and a place to relax on the site.

House, 160 m²

House, 160 m²

18 750 rub. /m²

An excellent house with a site is offered for sale.Address: Kirillov. The total area is 160 sq. m. On The Plot Of A Garden. The house has a storage room, electricity. 10 minutes road.

Private houses in Kirillovo have always attracted real estate buyers. The constantly updated database of the World of Apartments information portal will help you find and buy a house with a plot in Kirillov in the Kirillovsky district. To date, its electronic catalog contains 0 ads with photos from owners and 44 from real estate agencies. The most popular real estate agencies: user, Aristocrat, Etazhi-Vologda.

You can find information not only on the resale, but also on new buildings, and buy a house in Kirillov in the Kirillovsky district from the developer. Prices in the primary market are lower than for finished housing, and depend on the stage of construction of the acquired object – the higher the stage, the more expensive.

If we talk about the average cost per square meter for houses, then it is 37,425.44 rubles. The price depends on many factors, the decisive factors are the area of ​​the house itself and the area adjacent to it, the prestige of the area where the housing is located. The minimum cost at which you can buy a house in Kirillov is 750,000 rubles, the maximum is 6,900,000 rubles.

The electronic base of the World of Apartments portal most fully reflects the situation on the market. With her help, buying and selling houses in Kirillovo becomes simple and affordable.

Categories
Online Betting Sites

Buy a house in a village in Logoisk direction in the Minsk region | Selling a house in a village in the Logoisk direction inexpensively, Minsk region |

Do you want to buy a house in a village in the Logoisk direction in the Minsk region inexpensively? Favorable sale of houses in the village in the Logoisk direction without intermediaries in the Minsk region.

Houses for sale in a village in Logoisk direction

Buy a house, Polotsk district, ag. Bliznitsa, Molodezhnaya st., 4, 25 acres. Photo 1

Selling a house for a business with households. buildings on a plot of 25 acres, at the borders of the site there are three more free fields. Far from polluted cities, 25 km from Polotsk. Ideal for organizing business in various applications

Buy a house, Borovlyany, Kupalovskaya, 15, 13.1 acres. Photo 1

Buy a house, Borovlyany, Kupalovskaya, 15, 13.1 acres. Photo 2

Buy a house, Borovlyany, Kupalovskaya, 15, 13.1 acres. Photo 3

Buy a house, Borovlyany, Kupalovskaya, 15, 13.1 acres. Photo 4

Buy a house, Borovlyany, Kupalovskaya, 15, 13.1 acres. Photo 5

Buy a house, Borovlyany, Kupalovskaya, 15, 13.1 acres. Photo 6

Buy a house, Borovlyany, Kupalovskaya, 15, 13.1 acres. Photo 7

Buy a house, Borovlyany, Kupalovskaya, 15, 13.1 acres

Buy a house, Borovlyany, Kupalovskaya, 15, 13.1 acres

Buy a house, Borovlyany, Kupalovskaya, 15, 13.1 acres

2 levels, walls – white brick, roof – slate, built in 2000, built-up area 10 × 10 m, internal building area 297 / 120 / 10 m², plot area 13.1 acres, forest nearby, picturesque place, garage, garden, greenhouse, household

Buy a house, Dokshitsy, Zarechnaya, 27, 15 acres. Photo 1

Buy a house, Dokshitsy, Zarechnaya, 27, 15 acres. Photo 2

Buy a house, Dokshitsy, Zarechnaya, 27, 15 acres. Photo 3

Buy a house, Dokshitsy, Zarechnaya, 27, 15 acres. Photo 4

Buy a house, Dokshitsy, Zarechnaya, 27, 15 acres. Photo 5

Buy a house, Dokshitsy, Zarechnaya, 27, 15 acres. Photo 6

Buy a house, Dokshitsy, Zarechnaya, 27, 15 acres. Photo 7

Buy a house, Dokshitsy, Zarechnaya, 27, 15 acres. Photo 8

Buy a house, Dokshitsy, Zarechnaya, 27, 15 acres. Photo 9

Buy a house, Dokshitsy, Zarechnaya, 27, 15 acres. Photo 10

Buy a house, Dokshitsy, Zarechnaya, 27, 15 acres

Buy a house, Dokshitsy, Zarechnaya, 27, 15 acres

Buy a house, Dokshitsy, Zarechnaya, 27, 15 acres

I Will Sell A House Built In 2010 With All Amenities And A Picturesque Place Of The City Of Dokshitsy. Near the house there are all communications, an asphalt street and gas heating, which allows you to forget about (the beginning of the heating season in the apartment

Categories
Horse Betting

Buy Daewoo Matiz in Guryevsk: sale Daewoo Matiz with mileage and new, prices.

Private ads for the sale of used and new Daewoo Matiz in Guryevsk. Find out the cost of Daewoo Matiz and buy with mileage on Drom.ru

Sale Daewoo Matiz in Guryevsk

I bought a Daewoo Matiz for my wife, and if it were not for her feminine appearance, I would have traveled with pleasure. Comfortable interior, air conditioning, central locking.

Hello everybody! My name is Ekaterina, 23 years old. Since childhood, I dreamed of learning how to drive a car. In February 2018.

Hi all. I am writing the first review, so do not kick too much. Driving experience 11 years and during this time owned Gaz31029 1994, Nissan.

Hi everyone, and thanks in advance for reading this review. Purchase history is the most common. Finished driving school, a few months.

Hello. I want to write a review about my Matiz, he stayed with me for only 4 months, but that was enough for me. I'll start with the plus, it's small.

The car was bought by my mother in 2013, she inherited it from me in 2015. What can I say, a car for its price.

Sale Daewoo Matiz in Guryevsk

You are viewing the section Selling Daewoo Matiz.
View all about Daewoo Matiz
The Sale of cars section presents prices for new and used Daewoo Matiz in Guryevsk.
New cars, used cars and unused cars – find out the cost to buy Daewoo Matiz in Guryevsk.

Categories
Sports Betting California

Buy used GAZ with mileage in Russia | Prices for used GAS | Selling on Credit | Marketplace Autobroker Club

Catalog of used GAZ cars available with prices, photos and descriptions. Car appraisal, car insurance, car loan. Fast transaction processing. Marketplace Autobroker Club

GAZ catalog in Russia. Buy in credit

Buy used GAZ GAZelle Next, 2020, 149 hp in Russia Buy used GAZ GAZelle Next, 2020, 149 hp in Russia Buy used GAZ GAZelle Next, 2020, 149 hp in Russia Buy used GAZ GAZelle Next, 2020, 149 hp in Russia Buy used GAZ GAZelle Next, 2020, 149 hp in Russia

The sale of GAZ in Russia deserves special attention, which will be an excellent option for making a trip, within the city, as well as during trips to nature. Special attention deserves the products of the Gorky Automobile Plant, which produces high-quality and reliable vehicles for domestic roads. The vehicle is characterized by simplicity and convenience, which will make it easy and simple to use it in everyday use. Budget models are produced that can become a practical option that can become a profitable offer for every buyer. You will be able to buy GAZ in the company of an auto broker, which will make it possible to create the prerequisites for further savings, which is associated with the budget category of this car.

Buying on the website of an auto broker

You can easily buy GAZ in Russia, which has practical and noteworthy characteristics. Maximum reliability and durability, original layout and practical style. All this creates the conditions for making a quality purchase, which will save a lot of money and create practical conditions for further cooperation. Employees of the service will easily fulfill all the conditions so that in the future it will be possible to profitably exchange the vehicle. It is also worth noting that it is also proposed to make an exchange of a car, with an additional payment in the future.

Categories
Sport News

Football Cup of Belgium 2021/2022 – calendar, table, schedule of matches, news, statistics, transfers, fans on

Belgian Cup on Sports. Everything about the Belgian Cup tournament: game schedule, news, season calendar, tournament statistics, fans and blogs

Belgian Football Cup

Young Footballer No. 20 – Matisse Samoise. Gent’s new fan favorite, waited 14 years to take revenge on Anderlecht

Hello! You ended up on a blog where I suggested that Russian clubs take a closer look at interesting young players from all over Europe. The topic has temporarily ceased to be relevant, but I do not plan to stop publishing.

Gent took revenge on Anderlecht, won the Belgian Cup and will now represent the country in the Europa League

They brought back 2008: Gent and Anderlecht will play in the final of the Belgian Cup. Kompany on the verge of first trophy as a coach

Overview of the return semi-finals of the Belgian Cup.

Club Brugge rebounded in Gent derby, Anderlecht avoided defeat by Eupen thanks to a controversial 90+5=penalty

Overview of the first semi-final matches of the Belgian Cup season 2021/22.

A terrible knockout of the Swede, a protest from Anderlecht fans and expensive gifts from Standard – all this was in the – final of the Belgian Cup

Review of the quarter-final matches of the Belgian Cup season 2021/22.

Swede has a concussion

Marjan Shved was injured during a collision with the Eupen goalkeeper, losing consciousness.

Categories
Horse Betting

Who leads us to the master: Love Pronin | The newspaper Bulletin

Who leads us to the master: Love Pronin – I came to the city in 1974, ”says Lyubov Viktorovna. – Yuri Kondakov, who was part of the national team, on whom

Who leads us to the master: Love Pronin

“I arrived in the city in 1974,” says Lyubov Viktorovna. – Yuri Kondakov, who was part of the country, at which I looked with delighted eyes, was already trained here, there was a strong team of skaters, experienced coaches worked in the Sports School at the SK “Torch”: Anatoly Fedorovich Kuznetsov and Nelly Maksimovna Abashin. And I, a recent graduate of the Omsk Institute of Physical Culture, joined this strong team. The proposal to move to Sverdlovsk-45 after 2 years of work in N. Tagil seemed interesting, nature simply struck here: mountains, forests, lakes-amazing beauty!

Lyubov Pronin’s childhood passed in Vladivostok, where she at the age of 14-15 began to engage in skating sports, at 16 she performed the 3rd adult category and won the championship of the region. The girl was noticed – they were invited to the Omsk Physical Cultural Institute. So fate brought her to the coaching road, along which Pronin's love, without interrupting, has been walking for 45 years – tired, with the same joy and pleasure, as at the very beginning of the journey. Looking at the slender girlish figure of Lyubov Viktorovna, her young, with a sincer of her eyes, you will never believe that in August last year she celebrated her 70th anniversary.

“My main life interest is skating sports, children,” explains Lyubov Pronina. – I am interested in it, there is not even a thought to retire.

Lyubov Viktorovna several times in an interview calls himself a children's coach. Arriving in the city, she began working with children of grades 2-3. Three years later, she passed the children to experienced mentors. And in order to grow a real athlete from the child, it takes at least 8-10 years. To my question about the first coaching successes, Pronin's love shares his observation: the most strong set of the coach is often the very first. From the first set of Lyubov Viktorovna – Roman Sharov, master of sports.

– We had a very strong team, we won among the young men the championship of the CS, the championship of the region on the silver skates. Moving from young men to the category of “men”, Roman Sharov stopped performing-the time of the collapse of the 90s just began, the CS teams broke up, all the skating rinks were closed in the region. In N. Tagil, there used to be 3 rinks, 3 sports societies, we often went there for tournaments, in Sverdlovsk-probably 5-6 rinks, if not more. About 200 athletes performed at the competition, now-from the strength of 40-50. Today in N. Tagil – not a single skate section, not a single rink.

With nostalgia, the coach Pronin recalls pre-perestroika times, when the system of the Central Council, sports societies were in force, and there were no problems either with the inventory or with the departure for the competition, and the athletes of educational groups received additional food.KTO_NAS_VIVODIT_V_MASTERA_LYUBOV_Pronina_gazeta_Vestnik

Who leads us to the master: Love Pronin | The newspaper Bulletin

Who leads us to the master: Love Pronin – I came to the city in 1974, ”says Lyubov Viktorovna. – Yuri Kondakov, who was part of the national team, on whom

Who leads us to the master: Love Pronin

“I arrived in the city in 1974,” says Lyubov Viktorovna. – Yuri Kondakov, who was part of the country, at which I looked with delighted eyes, was already trained here, there was a strong team of skaters, experienced coaches worked in the Sports School at the SK “Torch”: Anatoly Fedorovich Kuznetsov and Nelly Maksimovna Abashin. And I, a recent graduate of the Omsk Institute of Physical Culture, joined this strong team. The proposal to move to Sverdlovsk-45 after 2 years of work in N. Tagil seemed interesting, nature simply struck here: mountains, forests, lakes-amazing beauty!

Lyubov Pronin’s childhood passed in Vladivostok, where she at the age of 14-15 began to engage in skating sports, at 16 she performed the 3rd adult category and won the championship of the region. The girl was noticed – they were invited to the Omsk Physical Cultural Institute. So fate brought her to the coaching road, along which Pronin's love, without interrupting, has been walking for 45 years – tired, with the same joy and pleasure, as at the very beginning of the journey. Looking at the slender girlish figure of Lyubov Viktorovna, her young, with a sincer of her eyes, you will never believe that in August last year she celebrated her 70th anniversary.

Categories
Horse Betting

KSK: Quality built into the system "

KSK: Quality erected to the PLAS system: in 2006. KSK received a certificate of compliance with the requirements of GOST R ISO 9001–2001 of the company's quality management system. Could you tell

KSK: Quality built into the system

If we talk about the specific requirements for the quality of the production of cards with a scratch-stripe in general, then one of our customers had a requirement to ensure the protection of personal information (PIN / PUK) applied directly to the SIM card by laser engraving. In this case, we used the application method. A scratch strip was glued onto the card in the right places, which had through notches-strokes to prevent the possibility of using it twice. The main requirements that the customer presented were the reliability of hiding information under the scratch strip.

PROS: In 2006 KSK received a certificate of compliance with the requirements of GOST R ISO 9001–2001 of the company's quality management system. Could you tell us more about the results of this certification from the point of view of the Business Proceedings facing KSK?

N. Yurchikhin: I’ll start with the fact that last year’s certification of our quality management system in the development, design and production of plastic cards with chip module for compliance with the requirements of GOST R ISO 90012001 is only one of the first steps implemented by the company in this direction, which is, which KSK will help to continue to successfully develop existing ones and develop new areas of business.

The presence of a quality management system is not just a tribute to fashion. First of all, this is the basis for the constant improvement of our business processes, including, of course, quality control processes, their optimization and, as a result, a decrease in internal costs.

By optimization of business processes, I mean, on the one hand, to ensure the flexibility of production that can fulfill orders of various difficulties as soon as possible with high quality, which in the conditions of the modern market is almost one of the key factors that determine the success of the company, but on the other hand Parties-the introduction of automated accounting using an ERP system and bar coding on all operations to increase their transparency.

If we talk about the immediate prospects of KSK from the point of view of the implementation of new areas of business, then among them the development of the production of products for the banking sector should be called, including certification in international payment systems for the production of EMV cards. In addition, the company's immediate plans are to obtain licenses for the use of cryptographic protection funds, and, as a possible prospect, obtaining the GSMA SAS certificate (Security Accreditation Scheme Certificate).

PROS: To date, the strategic area of ​​activity of KSK is the production of SIM cards GSM. Could you tell you more about the requirements for the quality of such smart cards regulated by ISO and GSM standards, including parameters such as the quality of chip-module production, its location on the map, the stability of plastic for SIM cards to elevated temperatures, and t . d.?

N. Yurchikhin: The basic requirements for the quality of plastic cards are set forth in international standards ISO/IEC 7810, 7816, 10373, the GSM 11.17 standard, the European standard EN 1292 and a number of others. To this list, it is also necessary to add a lot of standards and specifications that determine the characteristics and quality criteria of the chip modules themselves.As you know, the requirements for the quality of production of various types of cards-banking, SIM cards, scratch cards-have a number of fundamental differences. At the same time, there are a number of general requirements that apply to all types of cards. These include the stability of plastic to the effects of temperature, ultraviolet radiation, static electricity, radiation, chemicals, resistance to dynamic twisting and bending, etc.

In the production of SIM cards, the following parameters are also very important: the geometric dimensions of the map itself, the cavity into which the chip module will be implanted, compliance with the size of Plug in (compact plastic card with a chip module, which is broken out of the body of the SIM card and inserted Directly to the mobile phone), the quality and correct location of the notches that facilitate the breakdown of Plug in the end user, the height of the contact sites of the chip module relative to the map surface, the electrical functionality of the module and its adhesion to the card body (adhesion strength with the plastic base of the map).

The listed parameters of the SIM cards are very important, because each of them directly affects the operational characteristics of the product. Accordingly, all these parameters within the framework of the KSK quality management system are subject to strict control, starting from input control to control at each subsequent stage of the production process. For these purposes, KSK uses the most modern instrumental and test equipment of such famous manufacturers as Mitutoyo, ITM, ZWICK, RUHLAMAT, MUEHLBauer, which provides not only visualization of measurement results, but also output to the computer screen or printer, as well as the development of our Partners – Giesecke Devrib.

PROS: In last year’s interview to PLAS magazine* Vladimir Gaev, General Director of Smart Card LLC, noted that there were no complaints about the quality of its products by the quality of its products from customers, since the company's corresponding internal requirements for a number of aspects were relevant are even more stringent than the requirements of international standards. What are these differences and due to what they are ensured?

N. YURCHIKHIN: Yes, a number of internal requirements for the quality of the products that are installed in KSK are noticeably tougher than the similar requirements of ISO standards. First of all, this applies to mechanical tests of the card for resistance to dynamic twisting and bending. According to the requirements of ISO/IEC 10373-1, a card with an implanted chip module should withstand 1000 cycles of curve tests, and the same number of cycles-to twist. At the same time, the internal requirements installed in the KSK is twice as tougher: during the tests, the card should maintain its functionality after 2 thousand flexion/extensions or twisting cycles.

All operations of the technological process are subject to 100% visual quality control and the use of more stringent approaches to the selection of products for input control than recommended by ISO 2859-1 (in terms of printing products). We have also established stricter conditions and terms for the storage of components and materials than those established by their manufacturers themselves, which guarantees us to exclude the deterioration of the properties of these products while they are in stock.

Now a few words about the organization of production quality control. The very first stage of control is carried out by warehouse employees when they accept components and consumables received from our suppliers. They check the quantity, correctness of marking, shipping documentation and quality of packaging of products supplied to us. All this is recorded in the relevant protocols. If necessary, photography is carried out (for example, in case of detection of mechanical damage to the supplied materials or their packaging). Then the employees of the quality department come into play, who carry out incoming control in accordance with our internal procedures and the requirements of international standards. If the results of the incoming quality control are found to be satisfactory, the incoming products are assigned the status OK, and they can be used in production. The results of the input control are recorded in the protocol with the support of the printout of the measurement results, after which the actual production process begins. Otherwise, the received components and materials are blocked, their supplier is immediately notified, a complaint is made and, if necessary, photographs are taken that are attached to it.

PLUS: A few words about the measures taken by KSK in the framework of improving the efficiency of work with suppliers in terms of quality control of their products?

N. Yurchikhin: It should be noted that constant work with suppliers to improve the quality of their products is also one of the areas of our work. So, for example, the plastic that we use for the production of SIM cards is mainly Swiss and Austrian made. Our suppliers – Russian companies – buy white plastic from its direct manufacturers, after which they import it to Russia and print it in accordance with the required design, which is previously agreed with our customers.

Thus, initially the quality of the products supplied to KSK is guaranteed by its suppliers themselves. Here we are talking about such parameters as the quality of printing (booklets, reference books, registration forms, etc.), the quality of color printing on plastic, i.e. about the parameters observed within the framework of those areas that KSK does not independently implement.All operations of the technological process are subject to 100% visual quality control and the use of more stringent approaches to the selection of products for input control than recommended by ISO 2859-1 (in terms of printing products). We have also established stricter conditions and terms for the storage of components and materials than those established by their manufacturers themselves, which guarantees us to exclude the deterioration of the properties of these products while they are in stock.

Now a few words about the organization of production quality control. The very first stage of control is carried out by warehouse employees when they accept components and consumables received from our suppliers. They check the quantity, correctness of marking, shipping documentation and quality of packaging of products supplied to us. All this is recorded in the relevant protocols. If necessary, photography is carried out (for example, in case of detection of mechanical damage to the supplied materials or their packaging). Then the employees of the quality department come into play, who carry out incoming control in accordance with our internal procedures and the requirements of international standards. If the results of the incoming quality control are found to be satisfactory, the incoming products are assigned the status OK, and they can be used in production. The results of the input control are recorded in the protocol with the support of the printout of the measurement results, after which the actual production process begins. Otherwise, the received components and materials are blocked, their supplier is immediately notified, a complaint is made and, if necessary, photographs are taken that are attached to it.

PLUS: A few words about the measures taken by KSK in the framework of improving the efficiency of work with suppliers in terms of quality control of their products?

N. Yurchikhin: It should be noted that constant work with suppliers to improve the quality of their products is also one of the areas of our work. So, for example, the plastic that we use for the production of SIM cards is mainly Swiss and Austrian made. Our suppliers – Russian companies – buy white plastic from its direct manufacturers, after which they import it to Russia and print it in accordance with the required design, which is previously agreed with our customers.

Thus, initially the quality of the products supplied to KSK is guaranteed by its suppliers themselves. Here we are talking about such parameters as the quality of printing (booklets, reference books, registration forms, etc.), the quality of color printing on plastic, i.e. about the parameters observed within the framework of those areas that KSK does not independently implement.Therefore, if we notice this or that problem in the process of incoming control, it becomes the problem of suppliers.

Today we are considering the possibility of using, if necessary, the scheme of relations with suppliers of components and consumables, widely practiced by large foreign companies, which is called controlled delivery. Controlled delivery can be of the first and second levels. The first level implies that the supplier company carries out 100% output control of products supplied to a specific customer with whom controlled delivery is practiced. It is obvious that in this case, the supplier assumes all the costs of organizing such control by the efforts of its employees.

In the event that such an approach does not allow to completely eliminate problems with the quality of the supplied products, the relationship between the supplier and the customer goes into the category of controlled delivery of the second level. The latter may mean that an independent inspection company is involved in the implementation of 100% final control, while all the costs of paying for its services are again borne by the supplier company.

Of course, such a tough approach to working with suppliers is unprofitable for the latter, therefore, only a very large customer company with large volumes of orders can afford to implement such a relationship scheme. At the same time, in a number of cases, this scheme is the only effective one, providing economic incentives for suppliers to improve their own internal control of supplied products. Therefore, today we are making every effort to ensure that in the foreseeable future we will be able to rebuild relations between CSCs and suppliers according to this principle.

PLUS: Could you tell us more about the various quality control methods applied by KSK in the process of manufacturing GSM SIM cards, both at the organizational and hardware-software levels?

N. Yurchikhin: All control operations in production are carried out by plant operators who have received appropriate training.Detailed instructions describing how to perform a particular control operation are located in all areas. The first operation is Plug In. Before the installation is launched into operation, the operator cuts down 5 test SIM cards and checks the quality of cutting down, the quality and location of the notches, geometric sizes and location of Plug in. Moreover, all results are recorded in the protocol.

The quality of the notch is checked by tests of Plug in from the body of the card. All five cards should pass a test with a positive result. In the production process, we use 100%visual control and control using the PLUG IN location template. Then, the chip module is implanted into a plastic card-the operation Implantation. The operator during testing implants 15 cards with a dislocated Plug In, checks the disposal of chip module using the template, the electrical functionality of the implanted chip module using the card reader and the corresponding software. If the test results are satisfactory – a test for dynamic bending and twisting is carried out (8 cards and 2 cards are tested, respectively), the modular adhesion and the height of its contact sites (5 cards) are checked. At this stage, 100%visual control is also used, all results are recorded in the protocol. After receiving a positive result, the corresponding machine starts to work. After starting, the machine automatically controls the correct location of the card by transport, carries out electrical check and measure the height of the contact sites of all implanted cards. If the card does not pass according to any parameter, it is automatically rejected and thrown into a special tray with a machine.

Now a few words about quality control at the stage of personalization of the card. This operation is received by already cut down and borrowed cards. The operator personalizes the first 5 cards and carries out their electrical testing, and also checks the quality of laser engraving.If at least one of the cards does not pass the test – the work of the personalization complex is suspended, the engineer of the quality department and the UPP engineer are called to clarify the cause of the failure. With a positive result, the personalization complex starts into the work. After starting, the complex carries out electrical testing of personalized cards in automatic mode, rejecting and discarding the map quality that are not compliance with the requirements of the card in a special tray. The operator carries out 100%visual engraving quality control and selective electrical control of cards from each machine store (500 pcs.). If any inconsistencies are detected, an engineer of the quality department is immediately called.

And finally, we will consider the final operations – applying personal data to paper media (graphic personalization) and assembly of ready -made sets. In these areas, 100%control is also carried out using approved assembly specifications and Master -book. Employees of the quality department have the authority to immediately stop production when identifying any problems with the quality of the product.

As for the quality of chip modules implanted in the SIM card, it is guaranteed by the supplier. To date, the supply of samsung chip-modules are carried out through our German partner-GD. We also purchased pilot parties of chip modules from the Sitroniks Microelectronic Solutions, the NIME and Mikron OJSC, the corresponding unit of which was qualified by Infineon. For all the types of modules used there are official qualification reports (Qualification Report). In the case of chip modules at the input control, we only check the number and compliance of the module of the accompanying documentation. We get the modules ourselves in the form of a modular tape on the coil. At the same time, the manufacturer allows the presence of defective modules on the tape, but all of them are punched in certain places for the impossibility of implantation in the installation in automatic mode.

PLUS: What, in your opinion, are the most common general and specific problems of quality assurance in the production of SIM cards? What methods are used by KSK to identify them?

N. Yurchikhin: As practice shows, the most common card production quality problems include the following: poor quality of plug-in cutting, incorrect position of the module in the card cavity (module jam), implantation of a defective module (which was originally punched on the tape) and waste associated with cutting the module out of the tape. Typical problems at the personalization stage are electrical marriage or laser failure. All these errors are usually related to machine malfunctions, but they are quickly identified and corrected by the operator. So, for example, the quality of cutting is very much influenced by the composition of the plastic. Those who have dealt with punching dies know that one type of die is used for PVC plastic, and another for ABS. At the same time, as practice shows, even using the same type of plastic, for example, ABS, but with different additives to it, you can get a different quality of cutting. And this problem, unfortunately, can not always be solved by changing the parameters of the punching installation. This happens if the supplier mixes plastic with different additives within the same delivery. That is, here we again return to the issue of improving the efficiency of the organization of work with suppliers.

For each operation of the production of a SIM card, the maximum allowable percentage of defects is set, which for the most complex operations (personalization) is tenths of a percent of the total. Those are pretty tight limits. Of course, even using the most modern and high-performance equipment, it is impossible to completely exclude the human factor, therefore, sometimes mistakes made by the operator also occur.

As for the quality control methods used by KSK, as already noted, the quality of the chip module itself is guaranteed by the supplier. The location of the contact pads of the module is controlled using a special template with a coordinate grid printed on it.This is a fairly accurate and very operational control method. The situation is somewhat more complicated with the control of the adhesion of the module. To control this important indicator, we use two types of tests. The first of them implies the use of adhesion tester (Dynamic Repeated Bending Stress Test) is an express test that allows you to determine the quality of adhesion and quickly adjust the parameters of the implantation process. It is based on the dynamic bending of a small fragment of the card with a chipmodula. A more complex and longer type of testing is called Back Side Spot Pressure and is carried out using the ZWICK (Germany) test installation installation.

This test gives information about the value of the necessary effort required to tear off the module from the surface of the plastic medium. To do this, from the back of the card, a layer of plastic is removed in such a way as to expose the back of the module (I’ll clarify that the module is glued into plastic not along its entire surface, but along the perimeter). Then the module is placed in a special device, in which the force specified both by the punch of the tear -off machine is supplied both by size and in speed of movement. At the time of separation of the module from the plastic on the computer monitor, a protocol with the test results is displayed, which can be printed. The minimum acceptable force of separation is 50 N, but in KSK we work at the level of 70–80 N. I will not reveal a large secret – the laminate (glue) of the modular tape has a very great influence on the quality of adhesion. The adhesive tape is made by different manufacturers (Tesa, Cardel, Nitto). However, with similar characteristics of the ribbons they manufactured, each of these companies needs to configure their own implantation mode to obtain optimal results.

PRUS: What is the specifics of the requirements for the quality of Scratch cards of telecommunication operators (prepayment cards with a PIN code and opaque washed Scratch-strip)? As you know, the latter are not actually regulated in any part by international standards, but are formed and established by each issuer of such card products individually.What are the most typical requirements of this kind for mobile operators?

N. Yurchikhin: We have some experience with such products, KSK produces payment vouchers for one of the mobile operators. In our case, the basis of the voucher is cardboard, on which a scratch strip is applied by flexo printing, consisting of several layers: a transparent silicone base, a graphite layer for protection against translucence and a decorative scratch layer. The latter can be gray, silver, gold or holographic. Also, the application of a scratch strip can be carried out by hot stamping or application (gluing).

Categories
Nfl Betting

24 -hour sports shop | 24 -hour Moscow

24 -hour Moscow SPORTMaster at the Moscow Smolenskaya Group of Companies Sportmaster is the absolute leader of the retail and wholesale markets of sports goods of Russia and the CIS. We have reached

24 -hour Moscow

A round -the -clock spante store

Spectmaster on m. Smolenskaya

Sportmaster Group of Companies is the absolute leader of the retail and wholesale markets of sports goods in Russia and the CIS. We have achieved this thanks to a thoughtful strategy and professional team, its determination and confidence – combinations of qualities that lead to success not only sports teams, but also trading companies.

www.sportmaster.ru

The address:
m. Smolensk
Smolenskaya Square, 6.
Prezda map

Telephone:
8(499) 241-13-88, 241-31-48

The passage to metro Smolensk Arbatsko-Pokrovskaya line, go to the garden ring (1 exit), turn right towards the new Arbat. Go 2 min.
The passage to m. Smolenskaya Filevskaya line, go along the underground transition to the inside of the garden ring, the store is located a little further towards the new Arbat.

Categories
Sports Betting California

Curve Rih – now 16 °. Weather in Krivoy Rog by the clock.

Weather forecast for ten days in Krivoy Rog, Ukraine, including temperatures at night and day, humidity 38 % atmospheric pressure, direction and wind strength, visibility on roads, ultraviolet radiation, sunrise and sunset. Last update 05 May 2022, Thursday, 14:00

Weather in Krivoy Rog

Ukraine / Dnepropetrovsk region / Curve Rog – Weather now

Add to my city

Mark my city

Updated 12:00 05.05

By the clock

15:00 18:00 21:00 00:00 03:00 06:00
+17° +16° +11° +8° +6° +5°
Perebirally

Forecast for 10 days

It's clear

The probability of precipitation is 6% 0.0 mm

%% wn_direction %%

Wind Northeast speed 6.2 m/s

Humidity 33 – 58%

Pressure 759 – 761 mm Hg

Ultraviolet radiation 5

Sunrise 05:22

Sunset 20:04

The probability of precipitation is 4% 0.0 mm

%% wn_direction %%

Wind Northeast speed 4.2 m/s

Humidity 39 – 67%

Pressure 761 – 763 mm Hg

Ultraviolet radiation 6

Sunrise 05:21

Sunset 20:05

The probability of precipitation % 0.0 mm

%% wn_direction %%

Wind East speed 2.9 m/s

Ultraviolet radiation 6

Sunrise 05:19

Sunset 20:06

It's clear

The probability of precipitation % 0.0 mm

%% wn_direction %%

Wind Northwest speed 1.1 m/s

Ultraviolet radiation 6

Sunrise 05:18

Sunset 20:08

It's clear

Thunderstorms are possible

The probability of precipitation is 63% 5.4 mm

%% wn_direction %%

Wind Northwest Speed ​​5.2 m/s

Sunrise 05:16

Sunset 20:09

Perebirally

The probability of precipitation is 8% 0.0 mm

%% wn_direction %%

Wind northern speed 4.6 m/s

Sunrise 05:15

Sunset 20:10

Mainly cloudy

The probability of precipitation is 25% 0.0 mm

%% wn_direction %%

Wind the southwestern speed 4.1 m/s

Sunrise 05:14

Sunset 20:12

Cloudy

The probability of precipitation is 39% 0.0 mm

%% wn_direction %%

Wind northwestern speed 5.5 m/s

Sunrise 05:12

Sunset 20:13

Perebirally

The probability of precipitation is 38% 0.0 mm

%% wn_direction %%

Wind Western speed 4.5 m/s

Sunrise 05:11

Sunset 20:14

Cloudy

The probability of precipitation is 37% 0.0 mm

%% wn_direction %%

Wind northwestern speed 7.0 m/s

Sunrise 05:09

Sunset 20:16

Add to my city

Is your city crooked? Add this city to the panel at the top.

A detailed weather forecast for ten days in Krivoy Rog, including temperature at night and day, atmospheric pressure, humidity, direction and wind strength, road visibility, ultraviolet radiation, sunrise and sunset.

Israeli beaches – the temperature and state of water on the Mediterranean, Red Sea and on Lake Kineret.